top of page

UL - Underwriters Laboratories

image.png
  • UL required 2 x of each 8 x MPTS models for Certification

  • Certification of the 16 MPTS units lasted for 9-months

  • Post approval, UL  acquired one unit as a Customer

  • It is wheeled around for vendor product's testing

Energy Efficiency Improvement

Power

Voltage

Current

Demand

Reactive

Power Factor

Phase A

Volts

Amps

kVA

kVAr

PF

w/o MPTS
276.96
  64.83
  17.70
  13.80
    0.62

w/ MPTS
282.70
  44.12
  12.20
    1.52
    0.99

Change
  5.74
20.01
  5.50
12.28
  0.37

  Improve

   2.07%

 30.87%

 31.07%

 88.99%

 59.68%

Power
Voltage
Current
Demand
Reactive
Power Factor

Phase B

Volts

Amps

kVA

kVAr

PF

w/o MPTS

275.72

  68.75

  18.80

  13.80

  0.67

w/ MPTS
279.03
  51.64
  14.20
    3.34
    0.97

Change

  3.31

17.11

  4.60

10.46

  0.30

  Improve

   1.20%

 24.89%

 24.47%

 75.80%

 44.78%

Power

Voltage

Current

Demand

Reactive

Power Factor

Phase C

Volts

Amps

kVA

kVAr

PF

w/o MPTS

277.58

  73.02

  20.00

  16.60

  0.62

w/ MPTS

281.56

  49.80

  13.30

    0.44

    0.99

Change

  3.98

23.22  6.70

16.16

  0.37

  Improve

   1.43%

 31.80%

 33.50%

 97.35%

 59.68%

Dubai Factory UAE

Power
Voltage
Current
Demand
Load
Reactive
Power Factor
Emissions

Units
Volts
Amps
kVA
kW
kVAr
Efficiency
CO² lbs

w/o MPTS
395
173
117
96
68
0.80
19,481

w/ MPTS
395
139
95
90
30
0.95
15,865

Change
0
34
22
6
38
0.15
3,616

  Improve

  0.00%

19.65%

18.80%

  6.25%

55.58%

18.75%

18.56%

Power Quality goes way up!

Douglas County School District, CO

  • 2 x High Schools underwent an energy load comparison test

  • Conducted by the Architect/Engineer and Electric Utility

  • The schools are located 2-miles apart in Colorado

  • They are almost identical in every aspect:

    • +950-Students

    • +94,700 sq. ft.

    • 3-Floors

  • 1 x school with MPTS and 1 x school without MPTS

  • The Utility provided the 18-months of test results

image.png
  • Receptacles

  • Cafeteria

  • Elevators

  • Lighting

  • Servers

  • 7 x RTUs

  • 7 x VFDs

  • Controls

  • Pumps

  • Fans

KiloWatt Demand saved
= 14.50% kW
KiloWatt-hour Energy saved
= 8.28% kWh

image.png

North American Aerospace Defense Command

Cheyenne Mountain Air Force Station, USA

2015

Implemented by the 721st Civil Engineering Squadron CMAFS

  • Power usage is via compressed air within the Mountain

  • Power is derived from 4 x very large air compressors

  • MPTS™ ensures power quality & energy efficiency

  • 4-days w/o & 4-days w/ MPTS testing by 721st 

image.png
image.png
image.png
image.png
image.png
image.png
image.png
image.png
bottom of page